- Write by:
-
Friday, September 11, 2020 - 12:49:49 PM
-
648 Visit
-
Print
Mining News Pro - State-owned power utility Eskom says the conveyor belt that feeds coal into the Medupi generation units, which failed on the evening of September 9, has been repaired and is back in service.
This has lowered the risk of load-shedding.
However, while no load-shedding is planned for now, Eskom says its system remains constrained and vulnerable.
Short Link:
https://www.miningnews.ir/En/News/597980
BHP Group can’t cherry pick Anglo American assets without paying a hefty premium, Anglo investors told Reuters, ...
When former boss Mark Cutifani left Anglo American Plc in mid-April 2022, things had rarely looked better for the ...
Teck Resources, Canada’s largest diversified miner, saw its copper production jump by 74% in the first three months of ...
Anglo American Plc said it is has received an unsolicited non-binding combination proposal from BHP Group.
Anglo American Plc said it is has received an unsolicited non-binding combination proposal from BHP Group.
BHP Group Ltd. proposed a takeover of Anglo American Plc that values the smaller miner at £31.1 billion ($38.8 billion), ...
China’s state planner on Friday finalized a rule to set up a domestic coal production reserve system by 2027, aimed at ...
The world’s coal-fired power capacity grew 2% last year, its highest annual increase since 2016, driven by new builds in ...
Peabody Energy Corp. shares sunk to the lowest in seven months after the biggest US coal miner warned that first-quarter ...
No comments have been posted yet ...