- Write by:
-
Saturday, November 17, 2018 - 11:33:07 AM
-
1261 Visit
-
Print
Mining News Pro - Copper Mountain Mining Corp has filed a technical report on the feasibility study for its Eva copper project prepared in accordance with NI 43-101. The Eva Copper Technical Report is in support of the company’s October 1, 2018 news release announcing the feasibility study results on the project.
According to Mining News Pro -Copper Mountain Mining Corp has filed a technical report on the feasibility study for its Eva copper project prepared in accordance with NI 43-101. The Eva Copper Technical Report is in support of the company’s October 1, 2018 news release announcing the feasibility study results on the project.
The company has also filed a technical report on its Copper Mountain mine prepared in accordance with NI 43-101. The CMM Technical Report is in support of the company’s October 1, 2018 news release announcing an updated Mineral Reserve and Mineral Resource estimate for its CMM. The Technical Report also includes the PEA for the New Ingerbelle project. Copper Mountain has corrected the CMM Measured and Indicated Mineral Resource in the CMM Technical Report to 323 Mt grading 0.26% Cu, 1.05 g/t Ag and 0.08 g/t Au for 1,820 Mlb of copper, 10.9 Moz of silver and 0.87 Moz of. CMM’s Mineral Reserves and life of mine production plan remains unchanged.
Copper Mountain’s flagship asset is the 75% owned Copper Mountain mine located in southern British Columbia near the town of Princeton. The Copper Mountain mine produces about 90 Mlb/y of copper equivalent with a large resource that remains open laterally and at depth. Copper Mountain also has the permitted, development stage Eva copper project in Queensland, Australia and an extensive 4,000 km2 highly prospective land package in the Mount Isa area. The project is envisioned to be a conventional open pit with a conventional crush, grind, flotation circuit. The property is accessible by air and road and has sufficient water and power available through a 220 kV powerline.
Short Link:
https://www.miningnews.ir/En/News/300386
Top copper producer Codelco reported a decline in quarterly output due to lower quality ore at its aging Chilean mines — ...
Brazil’s Corumba region could more than double iron ore shipments through neighboring Uruguay this year if there is ...
BHP Group Ltd.’s proposal for a $39 billion takeover of rival Anglo American Plc is all about securing plenty of copper ...
When former boss Mark Cutifani left Anglo American Plc in mid-April 2022, things had rarely looked better for the ...
Chile President Gabriel Boric said on Thursday he is targeting an increase in the country’s annual copper output by 1 ...
Brazilian miner Vale SA sees no impact from BHP Group’s bid for Anglo American on the latter’s Minas-Rio project, its ...
Marex Group Plc and a group of the London-based firm’s shareholders raised about $292 million in a US initial public ...
Impala Platinum could cut 3,900 jobs as it restructures its South African operations due to lower metal prices, the ...
Australian Strategic Materials ASM.AX said on Friday it has received a non-binding letter of interest for a debt funding ...
No comments have been posted yet ...