- Write by:
-
Wednesday, February 5, 2020 - 11:07:07 AM
-
1724 Visit
-
Print
Mining News Pro - BHP’s Escondida copper mine in Chile, the world’s largest, won’t continue to draw fresh water from the Atacama salt flat, using instead desalinated water brought from its coastal plants.
According to Mining News Pro - The miner’s decision comes as the country is stepping up protections for a natural resource that has been depleted after decades of mining activity in and around the Atacama desert, the driest place on Earth.
The Atacama region, which hosts some of the planet’s largest copper and lithium mines, is occasionally hit by heavy rains and floods. According to Chile’s water authority DGA, however, the area has become drier over the last decade, adding an extra layer of difficulty to mining companies with projects and operations nearby, at times when the industry’s demand for water is expected to soar as ore grades decline.
BHP’s decision to withdraw applications to renew a permit to pump 428 litres per second of underground water is expected to reduce pressure on the vast, lithium-rich salt flat. The plain is home to top lithium miners Albemarle and SQM, which also extract fresh water from underneath it.
The world’s No. 1 miner already gets more than 40% of the water it needs from the ocean and has vowed to stop using fresh water drawn from the surface and underground in Chile by 2030. In 2018, the mining giant spent $3.43 billion on a desalination plant for the Escondida mine, which includes two pipelines to transport the water 3,200 meters above sea level.
Antofagasta’s (LON:ANTO) Zaldívar copper mine is also seeking to renew permits to draw water from the flat.
Unlike Escondida, it has no backup plan. The mine, which is approaching the end of its productive life, will have to close down if its water license isn’t renewed, the company has warned in the past. Even with water use permits in place, Zaldívar will probably stop producing in 2029.
The current license allows Antofagasta to pump 500 liters per second through 2025 and the miner is asking for a license to pump 213 liters per second through 2029.
Other than their high cost, desalination plants also pose worries related to the waste miners generate. That product — brine — is usually pumped back into the reservoir where the water was taken from. This causes an imbalance in the overall water composition, which is harmful to the environment within the sourcing body.
Short Link:
https://www.miningnews.ir/En/News/483920
Rare earths prices in top producer China jumped to their highest in more than seven weeks on Monday on a wave of ...
MP Materials announced on Monday it has received a $58.5 million award from the US government to advance the ...
MP Materials announced on Monday it has received a $58.5 million award from the US government to advance the ...
Australia will provide up to A$840 million ($550 million) for the first combined rare earths mine and refinery in the ...
BHP, the world’s largest miner, has come a long way in the matter of female representation in its workforce, ...
Australian Prime Minister Anthony Albanese said on Thursday the country was raising ties with Vietnam to the level of a ...
Canada Rare Earth Corp. (TSXV: LL) announced it has established rare earth supply operations in the Democratic Republic ...
Canada plans to boost its energy security by slashing the time it takes to develop new critical mineral mines by nearly ...
BHP has shown up to support vulnerable women and children with a $CAD500,000 ($571,050) donation to the YWCA Saskatoon ...
No comments have been posted yet ...