- Write by:
-
Friday, December 21, 2018 - 11:13:26 AM
-
862 Visit
-
Print
Mining News Pro - Walkabout Resources has announced an upgraded mineral resource estimate for its Lindi Jumbo graphite project, in south-eastern Tanzania, hiking the resource by 41.3%.
According to Mining News Pro - The resource increased to 41.8-million tonnes at 10.8% total graphite content (TGC), containing 4.5-million tonnes of graphite. Fifty-one per cent of the mineral resource that will form part of the initial mining and economic studies is now classified as measured and indicated, containing 6.6-million tonnes of graphite.
The resource includes five-million tonnes of high-grade material at 22.5% TGC
Short Link:
https://www.miningnews.ir/En/News/317402
Graphjet Technology, a Malaysia-headquartered developer of technologies to produce graphite and graphene directly from ...
NextSource Materials has submitted an application to build a downstream battery anode facility (BAF) to process graphite ...
Australia’s Syrah Resources said on Wednesday it would raise A$98 million ($64.73 million) through a placement and an ...
Graphjet, a developer of patented technologies to produce graphite and graphene directly from agricultural waste, ...
Australia’s Syrah Resources said on Friday it will supply natural graphite product from its Balama graphite operations ...
Nouveau Monde Graphite inked on Thursday multi-year offtake agreements with General Motors and Panasonic Holdings, with ...
Canada plans to boost its energy security by slashing the time it takes to develop new critical mineral mines by nearly ...
NextSource Materials said on Monday it planned to achieve nameplate capacity of 17,000 tonnes of concentrate per annum ...
Base metals declined after the Federal Reserve pushed back on interest-rate cut expectations and as investors weighed ...
No comments have been posted yet ...