- Write by:
-
Friday, August 17, 2018 - 6:27:49 AM
-
845 Visit
-
Print
Mining News Pro - Site of the former Snip high grade gold mine. (Image: Skeena Resources)
BRITISH COLUMBIA – Vancouver-based Skeena Resources has received the final assays from phase two drilling at the former Snip gold mine in this province’s Golden Triangle. The company is preparing a maiden resource estimate for the project.
Highlights of the underground core results include 13.80 g/t gold over 18.0 metres, 34.73 g/t over 3.50 metres, 11.75 g/t over 5.4 metres, and 31.20 g/t over 0.8 metre.
Skeena noted that the latest results from the Eastern Twin zone are of higher grades and thicker than that reported from historical drilling. This mineralized zone strikes east-southeast with dips ranging from 30° to 90° to the southwest. It has be traced horizontally for 1,000 metres and over a dip length of 500 metres.
More details are available at www.SkeenaResources.com.
Short Link:
https://www.miningnews.ir/En/News/239670
A Russian arbitration court ruled on Monday that four units of Swiss commodities trader Glencore will pay more than 11.4 ...
The four largest indigenous communities in Chile’s Atacama salt flat suspended dialogue with state-run copper giant ...
A prefeasibility study for Predictive Discovery’s (ASX: PDI) Bankan gold project in Guinea gives it a net present value ...
Chile’s state-run miner Codelco plans to select a partner for a future lithium project in one of the country’s top salt ...
A Native American group has asked all members of a US appeals court on Monday to overturn an earlier ruling that granted ...
Codelco is exploring more partnerships with the private sector as Chile’s state copper behemoth looks to recover from a ...
Representatives from the Peñas Negras Indigenous community, in northwestern Argentina, clashed with heavily armed police ...
The London Metal Exchange (LME) on Saturday banned from its system Russian metal produced on or after April 13 to comply ...
China’s state planner on Friday finalized a rule to set up a domestic coal production reserve system by 2027, aimed at ...
No comments have been posted yet ...